ORIGINAL PAPER
Failure frequency of candies packing line before and after introducing service strategy of Total Productive Maintenance (TPM)
,
 
 
 
 
More details
Hide details
1
Poznan University of Technology, Institute of Machines and Motor Vehicles, ul. Piotrowo 3, 60-965 Poznań, Poland
 
 
Journal of Research and Applications in Agricultural Engineering 2015;60(2):68-71
 
KEYWORDS
ABSTRACT
The candies packing line includes the following devices: candies stacking machine, packing machine, X-Ray controller, ma-chine grouping candies and packing them into boxes (boxformer), box wrapping machine, board machine and pallets wrap-ping machine. The line works 504 hours a month. During 2003-2007 the line was serviced according to the strategy of after-damage repairs and during 2008-2012 according to the TPM strategy. The introduction of TPM contributed to the de-crease of the line failure frequency by 50%, the standstill time by 60% and the increase of productivity by ab. 10%.
REFERENCES (6)
1.
Brzeski J., Figas M.: Wprowadzenie do TPM. Utrzymanie Ruchu, 2006, 6.
 
2.
Czerska J.: Total Produktive Maintenance. www.zie.pg.gda.pl (dostęp 27.11.2012).
 
3.
Dobrowolska A., Wasilewicz M.: Zarządzanie utrzymaniem ruchu w koncepcji TQM. Prace Naukowe Instytutu Org. i Zarządz. Politechniki Wrocławskiej, 2003, 73, Seria: Konferencje nr 23.
 
4.
Marks N.: Ocena sprawności linii rozlewu piwa do butelek po wprowadzeniu systemu organizacji pracy Total Productive Management (TPM). Inżynieria Rolnicza, 2007, 7.
 
5.
Marks N.: Wykorzystanie systemu organizacji pracy Total Productive Management (TPM) do zwiększenia wydajności linii rozlewania piwa w browarze. Inżynieria Rolnicza, 2006, 11.
 
6.
Szpytko J.: Kształtowanie procesu eksploatacji środków transportu bliskiego. Biblioteka Problemów Eksploatacji, Radom-Kraków: Wyd. ITeE, 2004.
 
eISSN:2719-423X
ISSN:1642-686X
Journals System - logo
Scroll to top